• 尊龙凯时[中国]人生就是搏!

    CEO Gongguang Lei inspect and guide the work of overseas projects

    2015-01-26 / 2372

        IDecember 2014, the company president Gongguang Lei went according to schedule two countries Equatorial Guinea

    and Nigeria, and respectively in these two countries to the companys project site visit guidance and sympathy for overseas

    employees.

        During the inspection company Equatorial Guinea Project Department, as well as consolidating the total project officers

    were invited to participate in overseas Equatorial Guinea’Annual work summary meeting for 2014. In the meeting, Lizhong

    Jie manager for Equatorial Guinea made a detailed presentation and summarizes the construction management process and

    lack of experience, and the 2015 work plan to do a report. For our overseas companies in Equatorial Guinea’s achievements

    and the ability of the team, ZHONG DI oversea company gave us the full affirmation and praise, and expressed his confidence

    in 2015 further cooperation!

        Gongguang Lei president to visit the project site field trips, visits to the various subprojects Mbini project, greetings frontline

    staff. He gave the fully affirmed, and pointing out that in future work to continue to strengthen construction management, strictly

    regulate the construction of safe and civilized, while the details of construction, but also put forward higher requirements. President

    Gong visited the workers dormitory and canteen, he pointed out local African poor sanitary conditions, everyday cleaning and

    disinfection must do the work to ensure a good living environment.During a visit to a machine shop, asked in detail about the use

    and maintenance of machinery and vehicles for the problems identified in the equipment supplies departments for registration

    ledger, various manual and mechanical vehicle maintenance records timely filing, good use of mechanical vehicles maintenance

    work.

        After inspection of the project in Equatorial Guinea, President Gongguang Lei held a project manager internal forum. He

    gave full recognition for Equatorial Guinea’s project, thorough analysis of the domestic and international situation, and made a

    fervent hope for the project managemen teamHraised two requirements for Equatorial Guinea at this stage for the case,

    one is that Mbini project almost finish, so the project staff will concentrate on doing clearing workSecond, actively explore

    the market, and establish a brand image in Equatorial Guinea.

        After Equatorial Guinea inspect, president Gong went to Nigeria branch. During Nigeria, he inspected in Kebbi State gravel

    plant, and reached a "common cooperation, mutual winwin" collaboration with local partners. Meanwhile, he did aspects of

    exchange and communication with Chinese companies in Nigeria, and made a clear division of Nigeria as well as the future

    development direction of market developmentPresident Gong affirmed the hard work of all branch staff pay and job

    performance, we hope that in the new year, make persistent efforts to overcome difficulties, bravery and hard work, with

    their wisdom and sweat for the company to carve out a broad market.

    友情链接: